Cubic Yard, Tonnage & Construction Material Calculator
Presets:
1. Material Grade & Project Dimensions
Area: 360.0 sq ft (33.45 m²)Net Vol: 4.44 cu yd (3.40 m³)
Area: 160.0 sq ft (14.86 m²)Net Vol: 1.98 cu yd (1.51 m³)
2. Material Takeoff, Blueprint & Cost
Total Volume & Tonnage (incl. waste)7.06 cu yd · 9.53 US tons5.40 m³ · 8.65 t (19,067 lbs)
Total Material Weight
9.53 US tons
19,067 lbs (100 lb/ft³)
Store Bags (50-lb)
382 bags
190.7 cu ft (5,399 L)
Total Project Area (Net)
520.0 sq ft
48.3 m² (+10% Waste)
Half-Ton Pickup Truck Loads
13 trips
@ 1,500 lb safe bed payload
Cost Break-Even: Bulk Dump Truck vs. Store BagsBulk Delivery saves $1,379
Bulk Dump Truck (9.53 US tons + $85)$524
382 × 50-lb Hardware Store Bags$1,902
Show Step-by-Step Formula & Takeoff Math
Net Area = 520.00 sq ft (48.31 m²)
Net Volume = 173.33 cu ft ÷ 27 = 6.42 cu yd
With +10% Allowance = 7.06 cu yd (5.40 m³)
Weight = 190.67 cu ft × 100 lb/ft³ = 19,067 lbs = 9.53 US tons (8.65 t)